Fatekh Vergasov
Heating and cooling installation
470 Ruthven Avenue, Palo Alto, CA 94301-1101
Contractor to take Palo Alto City permit
 
First floor (1,200 sq. ft.) - works in the partial basement and in crawl space with 24"- 29" height from soil to the joist
 
0. Two existing floor furnaces removal
 
1. Install new:
 
1.1. Furnace - XT90 high efficiency horizontal, single stage, 80,000 BTU, SEER 13,
1.1. All new duct works with registers
1.3. Run gas and electrical to the furnace - use existing 220v service for Dryer
1.4. Horizontal coil (copper tubing) - approximately 50'
1.5. Refrigerant Line
1.5. A/C - "Carrier", model 38HDR036, 3 ton, slim line, condenser pad
1.6. Feel with cooling fluid (refrigerant)
1.7. Panel - size 100
1.8. Thermostat "White Roger" - 5 day 2 stage
1.9. Double-wall flue
1.10. Supply Openings and return air gril
1.11. Clean-up & haul away debris
1.12. Test and Run
 
Second floor (loft) - approximately 250 sq. ft.
 
1. Install new Mitsubishi ductless split 2 ton 24,000 BTU
2. Run electrical - use 220v service from main electrical box
3. Run Refrigerant Line
2. Feel with cooling fluid (refrigerant)
3. Test and Run
 
Washer and dryer
 
Run gas for Dryer, which was disconnected from electrical service to allow 220v service for 1st floor installation

Design

 