Fatekh Vergasov
|
Heating and cooling
installation
470 Ruthven Avenue, Palo Alto, CA 94301-1101
|
Contractor to take Palo Alto City permit
First floor (1,200 sq. ft.) - works in the partial basement and in crawl space
with 24"- 29" height from soil to the joist
0. Two existing
floor furnaces removal
1. Install new:
1.1. Furnace - XT90
high efficiency horizontal, single stage, 80,000 BTU, SEER 13,
1.1. All new duct
works with registers
1.3. Run gas and
electrical to the furnace - use existing 220v service for Dryer
1.4. Horizontal
coil (copper tubing) -
approximately
50'
1.5. Refrigerant
Line
1.5. A/C -
"Carrier", model 38HDR036, 3 ton, slim line, condenser pad
1.6. Feel with
cooling fluid (refrigerant)
1.7. Panel - size
100
1.8. Thermostat
"White Roger" - 5 day 2 stage
1.9. Double-wall
flue
1.10. Supply
Openings and return air gril
1.11. Clean-up &
haul away debris
1.12. Test and Run
Second floor (loft) - approximately 250 sq. ft.
1. Install new
Mitsubishi ductless split 2 ton 24,000 BTU
2. Run electrical -
use 220v service from main electrical box
3. Run Refrigerant
Line
2. Feel with
cooling fluid (refrigerant)
3. Test and Run
Washer and dryer
Run gas for Dryer,
which was disconnected from electrical service to allow 220v service for 1st
floor installation
Design