  March 12, 2005
  House is loaded 
  with both sheetrock and roof tile...
  Pluming is done 
  85%
  Heat ducking and 
  sheet metal works are done - 95%
  Electric wire is 
  done - 95%
  Master bath-room 
  shower "hop mop" is done - 100%
  Papering, i.e. 
  "chicken wire" will be done in 3 days
  Next step - 
  inspection
  After that - 
  insulation and sheet rocking
 Spring! Rear elevation (facade) with sunken patio and stairway to the basement Both front and rear porches are waterproofed by cupper Roof tile are loaded 
 
 
 
 
  |