March 12, 2005
House is loaded
with both sheetrock and roof tile...
Pluming is done
85%
Heat ducking and
sheet metal works are done - 95%
Electric wire is
done - 95%
Master bath-room
shower "hop mop" is done - 100%
Papering, i.e.
"chicken wire" will be done in 3 days
Next step -
inspection
After that -
insulation and sheet rocking
Spring! Rear elevation (facade) with sunken patio and stairway to the basement Both front and rear porches are waterproofed by cupper Roof tile are loaded
|