| |
Concrete slab investigation
Job
address:
300 Sequoia Avenue, Palo alto, CA 94306-1045

What does this letter mean?
1. We spent almost 10 days in attempt to dry your concrete
slab, but we were not successfull
2.
We determinete by instrumental measurements, that the body of concrete slab
totaly accepted water in the deple of 3", because there are no xypex in it
3.
This slab impossible to dry without hardwood floor demolition, what we start
to do tomorrow Fabruary 23, 2006, at 08 am
4.
Demolished HW floor will be replaced with carpet (I alredy accepted the floor
company bid in amount about $4,000: HWF demolition and carpeting)
PS.
Robert, I still hope for you cooperation
Fatekh Vergasov
Complaint jurisdiction
|